BPCL

BPCL Natural Gas Portal

ABOUT PIPELINES

Find out more about BPCL pipelines.

KNOW MORE
BPCL In Gas

OVERVIEW OF BPCL PIPELINES

KNOW MORE

 

Details of BPCL's Product Pipelines in Operation as on September 2022 are as under.

Sr. No. Name of the Pipeline Year of Commissioning Length(KM) Design Capacity(MMTPA)
Captive Pipelines
1 Mumbai-Manmad-Bijwasan 1998/2003/2007 1389 6
2 Bina-Kota 2011 259 4.4
3 Cochin Coimbatore Karur 2002 293 3.3
4 Mumbai Refinery-Santacruz 2013 15 1.44
5 Kochi Refinery-Kochi Airport 2013 34 0.6
6 Mumbai Uran 2013 28 0.8

PNGRB – Regulatory Requirement

Sr. No. Pipeline Length(KM) Design Capacity (MMTPA) PNGRB Authorisation Pipeline Data as per PNGRB requirement Pipeline Route Map
1 Kota Jobner 211 1.7 Letter attached Details Attached Route attached
2 Bina Panki (under construction) 355 3.5 Letter attached Details Attached Route Attached
3 Krishnapatnam Hyderabad (under construction) 455 2.6 Letter attached Details Attached Route Attached
4 Irugur Devangonthi (under construction) 294 3.52 Letter attached Details Attached Route Attached